Genco Construction
Tree-lined residential street in Allen, Texas

Allen

Allen Kitchen, Bathroom & Addition Remodeling

Allen remodeling for the 15-to-20-year-old homes that are now ready for their second life — kitchen layout reconfigurations, bathroom rebuilds, and lighting that finally makes sense.

Typical timeline
8–16 weeks
Typical pricing
$35K – $175K+
Warranty
1-yr workmanship · 2-yr MEP · 6-yr structural

What we remodel

Services in Allen

  • Galley-kitchen openings into family-room sightlines
  • Builder-grade bathroom upgrades with proper waterproofing
  • Lighting redesign — task, ambient, accent layers
  • Process-driven scheduling and documented progress

How we work

The Designed to Live Better Method

Discover → Plan → Build → Finish. A planning-first process that locks scope, selections, and the schedule before construction starts — so your Allen project stays organized from day one through final walkthrough.

Learn about our process

Allen

Remodeling in Allen

Allen grew rapidly between the late 1990s and the 2010s, so most of the 75002 housing stock now sits in the 15-to-20-year window where mechanical systems are still solid but kitchens and bathrooms feel dated. The defining remodel pattern in Allen is the galley-kitchen opening: many homes here were built with the kitchen tucked behind a wall, separated from the family room by a peninsula that looked great in 2005 and feels closed-off now. Opening that wall with a properly engineered beam, repositioning the island, and redesigning the lighting changes the entire home's feel. Bathrooms here are usually builder-grade originals — fiberglass shower pans, single-pane glass, vinyl flooring — and rebuild well into modern frameless-glass, custom-tile spaces.

Coverage

Allen ZIP codes served

We serve all of the following ZIP — and surrounding addresses on a case-by-case basis.

  • 75002

Frequently asked

Allen remodeling questions

Yes — that's most of what we do here. Allen homes built between the late 1990s and the 2010s typically have builder-grade cabinetry, basic tile, and standard fixtures that homeowners are ready to upgrade. We replace cabinetry, upgrade countertops, redesign lighting, and rebuild bathrooms with proper waterproofing.

A typical Allen bathroom remodel runs 6–10 weeks depending on scope. Guest bathrooms sit on the shorter end; primary suites with structural changes or significant tile work are on the longer end. We define the full schedule before construction starts.

Allen homes typically suit transitional and modern-traditional kitchen designs — shaker cabinetry, quartz or quartzite counters, layered lighting, and an island sized to the actual room. We often move from closed-off galley layouts to open-concept kitchens with seating-friendly islands.

Yes. We manage the permitting process with the City of Allen for all projects that require it, including structural modifications, plumbing relocations, and electrical panel upgrades.

Planning a project here?

Planning a remodel in Allen? Let's outline next steps.

Schedule a consultation and we'll walk through your goals, your space, and what a realistic scope looks like.