
Bathroom Remodeling
Bathroom Remodeling in Dallas–Fort Worth
A better bathroom starts with a plan — and finishes with details. Genco delivers high-quality bathroom remodeling across DFW with waterproofing-first execution, guided selections, and organized scheduling. From primary bath upgrades to full tear-out rebuilds, every project follows our structured process so scope stays clear and results last.
Bathrooms that look refined and perform long-term
We remodel bathrooms with a focus on the systems that matter most: waterproofing, ventilation, durability, and finish quality. Every project is managed end-to-end by our team.
- Showers and wet areas (tile, glass, drains, niches / benches)
- Waterproofing systems and substrate build-up
- Vanities, storage, mirrors, and lighting upgrades
- Plumbing and electrical updates (when required)
- Flooring, trim, paint, and final detailing
- Ventilation improvements and moisture management
- Heated flooring systems (scope dependent)
- Frameless glass enclosures and custom hardware
Choose the path that fits your goals
Primary bathroom remodels
Daily function + refined finishes. Built around how you start and end each day. Typical range $25K–$85K.
Spa bathroom remodels
Retreat-style, premium finishes, wet-room concepts (scope dependent). Typical range $65K–$120K+.
Full bathroom remodels
Complete tear-out and rebuild for a cohesive reset. Typical range $18K–$100K+.
The difference is the unseen work
The most important part of a bathroom remodel is invisible in the finished product. Waterproofing, substrate prep, and proper slope engineering protect the structure of your home for decades. We use sheet-membrane systems (Schluter Kerdi or equivalent) on every shower — no exceptions. This commitment to building systems correctly is what separates a bathroom that looks good on day one from one that still performs flawlessly in year ten.
How a bathroom remodel works with Genco
Every bathroom follows the Designed to Live Better Method — a structured process that keeps scope clear, selections locked, and the schedule on track.
- 01
Discovery & assessment
We walk the space, discuss goals, assess plumbing access, ventilation, and structural conditions. Budget parameters and scope are outlined before commitments are made.
- 02
Design & selections
Layout is finalized, tile patterns are planned, vanity and fixture specifications are locked, and the full scope is documented with transparent pricing.
- 03
Pre-construction
Materials are ordered, trade sequencing is mapped, and permits are pulled when required. Everything is staged so construction starts without waiting on decisions or deliveries.
- 04
Demolition & rough-in
Existing finishes are removed, plumbing and electrical are updated or relocated, waterproofing systems are installed, and the space is prepped for finishes.
- 05
Finish installation
Tile, vanities, countertops, glass, fixtures, lighting, and trim are installed in sequence with quality checkpoints at every stage.
- 06
Walkthrough & closeout
Punch-list items are completed, the space is cleaned, and we walk the finished bathroom together to confirm every detail meets the standard.
Bathroom remodel pricing tiers
These ranges reflect typical DFW bathroom remodels. Every project receives a detailed, scope-based estimate.
Good
$18K–$40K
- Standard porcelain tile (floor + shower)
- Stock or semi-stock vanity
- Chrome or brushed nickel fixtures
- Basic frameless glass or shower curtain
- Standard lighting package
Better
$40K–$65K
- Large-format tile with accent mosaic
- Semi-custom vanity with quartz top
- Matte black or brushed gold fixtures
- Frameless glass enclosure
- Layered lighting (task + ambient)
- Heated flooring
Best
$65K–$100K+
- Premium natural stone or designer tile
- Full custom vanity with integrated storage
- Designer fixtures (Brizo, Waterworks)
- Frameless glass with custom hardware
- Full lighting design with dimmers
- Heated floors + towel warmers
- Freestanding soaking tub
Mistakes we prevent on every bathroom remodel
Skipping waterproofing behind tile
How we prevent it: Every shower we build gets a full sheet-membrane waterproofing system — walls, curb, floor, and all penetrations. This is the most critical system in a bathroom and the most commonly cut corner.
Undersizing ventilation
How we prevent it: We size exhaust fans to the bathroom's square footage and ensure proper duct routing to the exterior. Inadequate ventilation causes mold, peeling paint, and premature finish deterioration.
Choosing tile before finalizing layout
How we prevent it: Tile selections are made after the layout is locked so patterns, proportions, and accent placement work with the actual wall dimensions — not a generic plan.
Ignoring drain placement for curbless showers
How we prevent it: Curbless / zero-entry showers require precise floor slope engineering. We plan drain placement and floor pitch during design to ensure proper drainage without compromising the threshold-free entry.
Rushing fixture selection
How we prevent it: Fixtures affect rough-in dimensions — faucet spread, drain placement, and supply locations must be confirmed before walls close. We lock fixtures during planning.
Frequently asked
Questions we hear most
Typical timelines: 4–6 weeks for a standard bath, 6–8 weeks for a primary bath, and 8–12 weeks for complex spa-style remodels. Material lead times can extend this by 2–6 weeks depending on selections.
We use sheet-membrane waterproofing (Schluter Kerdi or equivalent) on every shower and wet-area build. This provides continuous, tested waterproofing behind tile and is the current industry best practice for moisture management.
It depends on the upgrade. Many primary bathroom remodels achieve significant improvement within the existing plumbing footprint. If you're swapping a tub for a walk-in shower or relocating a vanity, plumbing moves may be necessary — we evaluate during discovery and explain the cost / timeline impact.
Yes. Plumbing relocation, electrical changes, and structural modifications require permits in DFW municipalities. We handle all permitting and inspection coordination.
Ready to plan your bathroom remodel?
Schedule a consultation and we'll outline next steps based on your goals, scope, and finish level.