Full bathroom rebuilds
Full Bathroom Remodels in Dallas–DFW
A full bathroom remodel is a complete reset: tear-out, rebuild, and a finished space that looks cohesive and performs long-term. Most projects range from $18K–$100K+.
What's included
- Demolition and preparation for a clean rebuild
- Shower / wet-area rebuild with waterproofing systems
- Tile, flooring, trim, paint, and finish carpentry
- Vanity / storage planning and mirror / lighting upgrades
- Plumbing / electrical updates (as required by scope)
- Glass, fixtures, and final detailing
Why full remodels win
They allow you to fix layout pain points, upgrade systems, and align the entire bathroom visually.
- Address hidden issues (rot, outdated plumbing) discovered during demo
- Optimize layout for how you actually use the space
- Coordinate all finishes for a cohesive result
- Modern waterproofing protects the home for decades
Our 6-phase process
- 01
Discovery
Walk the space, discuss pain points, define what 'done' looks like.
- 02
Planning + selections
Layout planning, material selections, and procurement before demo.
- 03
Demo + rough-in
Complete tear-out, subfloor inspection, plumbing / electrical rough-in, and any structural modifications.
- 04
Waterproofing + tile
Sheet-membrane waterproofing, shower-pan construction, tile installation, and grouting. The most labor-intensive phase.
- 05
Fixtures + finish
Vanity install, countertop templating, glass enclosure, fixtures, paint, trim, and hardware.
- 06
Closeout
Final punch list, cleaning, and walkthrough. We don't call it done until you do.
Frequently asked
Questions we hear most
A full remodel means complete tear-out and rebuild — everything from drywall to fixtures is new. This is different from a refresh (cosmetic updates) or a partial remodel (replacing some elements while keeping others).
Full bathroom remodels in DFW typically range from $18,000 to $75,000 for a standard bathroom, and $50,000 to $100,000+ for a primary bathroom. Cost depends on size, finish level, and plumbing complexity.
Plan for 5–8 weeks of active construction, plus 2–4 weeks of pre-construction for planning and material procurement. Complex projects may take 8–12 weeks total.
Phased remodels are possible but rarely cost-effective. Mobilizing trades twice, protecting finished work from adjacent construction, and coordinating across phases typically adds 20–30% to total cost.
Common discoveries during demo: rotted subfloor or framing (especially around toilets and showers), outdated galvanized plumbing, insufficient electrical, and missing or failed waterproofing. A 10–15% contingency covers most surprises.
Full reset, clean rebuild
Schedule a consultation and we'll scope the tear-out and rebuild to land where you actually want it.